Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.
Creator | Russell Morash |
---|---|
Actor | N/A |
Country | United States of America |
Production | This Old House Productions |